Blog Archives

Successful Day Two

Today was day number two in the new roofing chapter of our lives (does anybody hear a soap opera tune playing in the background and are you seeing an hourglass? Hmm-Maybe that’s just me). The team that showed up yesterday showed up again today and brought a friend with them. Yessss! I like helpers!

This morning when they showed up, they brought with them some more equipment, a cement mixer, some large orange tubes, tools, etc. After unloading everything, they proceeded to do some more drilling. At this point Dude started getting antsy cuz he thought they were drilling more holes in the house to put up more scaffolding. So what does he do? He says to ME, “Go outside and see what they’re doing! I don’t want more holes in my house!” So, I went to investigate and it turns out that those plastic orange tubes they brought were for making a long tube to throw the tuiles down off the roof. They were drilling holes in them to clamp them together to make the chute. All was good. Maybe he would be able to relax now.

I pretty much thought that once they were done with getting the rest of the stuff set up, they would be done for the day since the roofing materials had not appeared, yet. See, I hadn’t taken my car out of the garage this morning in order to leave for work since yesterday one of the guys told me that it would be no problem to do so. They had put up the scaffolding in such a way that we were able to make a clean exit if need be.

So, taking that into account and the fact that no materials were still in my yard this morning, I figured that once they dropped off the rest of their equipment, I could make a clean get-a-way. Wrong, while two of the guys finished the work here, one of the guys went off down the street to get some of the roofing materials, so I was still stuck.

When worker bee number three came back, they parked the truck right in front of my garage to unload all the materials.

Then, just when I thought they were again done for the day, they proceeded to put up the chute.

Remember the orange tubes for the tuile chute? They attached the top part to the scaffolding and the bottom part to the bed of their truck. Do we have something like this in The States? I’m sure I’ve seen a regular chute made for this kind of work, but one made out of orange tubes?! I don’t think I’ve seen this before.

Here what it looks like:

Now, do you wanna guess where their truck is?? Yup, that’s right, parked in front of my garage. Since they had everything all tied down I didn’t want to tell them that I needed to leave so I just let it go and continued to work from home today. I’ve made a mental note to get my butt outta bed super early tomorrow and get my car out of the garage so I can make it to work!

After a bit of time it suspiciously got quiet outside so I thought maybe they had left and maybe the bucket tie down was just to be sure it was going to work and they had already untied it and drove away. Nope, they were just taking a lunch break. Once that break was over, wow, the racket that they made was ridiculous! Workers number one and two were up on the roof getting all the tuiles then handing them over to worker number three who was throwing them down the chute and into the bed of his truck. The sound of the tuiles hitting the truck was so loud that a few times it caused me to jump (the echo through the town must have been awesome for our neighbors). This noise continued on for about 3 hours until they finally knocked on the door and said that they were finished for the day and would be back tomorrow. They were heading to one of my favorite places, the local dump, to get rid of the old roofing material.

Once they left I took some shots of what was still remaining on the roof. As you can see, they did leave the tuiles on the ridge and the ones just below so that if it were to rain we would be protected. These are holding down the plastic cuz this is the area that leaks the most. They also left the tuiles around the side of the roof. I suppose this is to hold the fiberglass material down. What you see in the pictures is what’s left of the old cement, which is pretty much sand now, and the stuff that it’s resting on is the old fiberglass roofing material.

At least we have something up there since they said it might snow tonight. I totally can’t believe that cuz today we actually hit a high of 10C!  Wow, sun was shining AND work is commencing. Day number two was pretty much a success. I really would like to keep this ball rollin’!

By the way, does scaffolding held up by three, small, stacked pieces of wood seem safe?

 

Fuel and Scaffolding All In Three Days

We finally have fuel back in our boiler tank. It was definitely a very cold weekend without heat. After huddling in the kitchen and memorizing all the lines in the Harry Potter series and then the Star Wars trilogy due to my weekend movie marathon, I was glad when the fuel guy arrived on Monday morning. He was late, big surprise, but he did show up on the expected delivery date so I guess I can forgive him the lateness (plus he had the most gorgeous Paul Newman blue eyes ever).

He had to park his truck outside our property because it was too big to fit through the gate (same problem as the material delivery truck fiasco). No big deal for the fuel truck, though, as he had a hose that was around 40 meters in length. He was able to run the hose through our garden and into the garage and all the way back to our tank.

It only took about 5-10 minutes to give us the 1000 liters we ordered. We didn’t even have to move the car or any of our stuff out of the way! It was simple, easy and expensive. This is how I feel about the simple and easy part 🙂  This is how I feel about the expensive part 😦 This summer we will be working on ways to improve the efficiency of our home so that next winter we will be more prepared and try to use less fuel and be more energy efficient. I think we can do it so I’m not too worried. Even thought the fuel costs an arm and a leg, I still love my heating system! The fuel guy seemed to like it too and kept raving about our tank. He thought it was super cool. He has good taste in fuel tanks!

After the fill up, away he went with my money and away we went with turning the system back on. Heat at last, that’s always a good thing in weather like this.

That same evening while I was at work, I got a call from Mr. Right Hand Man who said that they were ready to come to my house and put up the scaffolding. He wanted to know if Tuesday morning would work. Unfortunately, ce n’etait pas bon for me and I had to tell him no, but that Wednesday would be good. I was in luck because Wednesday happened to be an okay day for him and his team, too.  Yippey, cuz Monday was the day I hit the jackpot.

This morning I got up early in anticipation for the 8:30ish arrival. Well 8:30 came and went and so did 9:00. Around 9:30 I called Mr. Right Hand Man to ask him what was happening. He didn’t answer so I left a message to please call me back and verify that the team was really showing up today.

Around 9:45 the team of two guys showed up with the scaffolding. They took a look around and then talked to my neighbor (whose garden will be hosting the scaffolding while the façade is done). They finally came to the conclusion that the best thing to do was to put up the scaffolding in our yard for the first week of work to do the roof and then once that is done they will take the scaffolding down and reset it up in our neighbor’s yard for the work on the façade. This way they (and we) won’t have to bother our neighbors with having this big contraption in their yards for a long duration. For our neighbors, this cuts the time in half that the scaffolding will be in their yard. I thought that was a great idea (cuz living in a village house you really don’t want to piss of and bother your neighbors to much, close quarters and all).

Well, to work these guys went and they put up the scaffolding in about 3 hours. During this time Mr. Right Hand Man decided to call me back. That was nice. I let him know that his little helpers had arrived and were busy getting their work done outside in the freezing cold.

Now our house looks like this and believe me, I love it!

Finally, we have some positive progress to our renovation nightmare. The only thing Dude was really worried about is that they had to drill holes in the side of the house to anchor the scaffolding. That’s all we need is more holes in this place! I’m not too worried. When they take the scaffolding down, they should be able to fill those in. After all, they’ll already have the colored stucco for the façade ready to go, what’s a few more dabbles on this old place. I’m sure it will be no problem for them.

When the guys left they said that they were going to check on when the materials will be delivered and they are hoping that all will be ready for tomorrow. I guess I won’t know until tomorrow, though. One of the guys said that until all the roofing material is here, they can’t start the work because they don’t want to risk taking off the old roof and not having anything to cover it with (for who knows how long) cuz if the weather turns bad again we will be screwed. I like his logic.

So for now, all we have is a fashion accessory to our house and we have to wait and see when the progress will continue. Forward march!

%d bloggers like this: