The Roof is Finally Done!

Yippey! Our roof is finally finished! It’s been months in the making (as all of you who are faithful readers of my ramblings know), but now I am happy to report that the workers completed the job today and it looks terrific. Now I am proud to say I have one of the newest and best looking roofs in my village 🙂

This morning the workers came to put on the finishing touches and to do all the clean up. They are in the process of picking up all the junk in my garden and taking all the trash to one of my favorite places, the dump. All the materials are slowly being moved out of the way or taken away.

They moved some of the things to the front part of our garden.

I’m not sure if the mixer will be used for the façade or not, but the other materials should be hauled away in the next day or two. The scaffolding is still up. Sometime this week, hopefully tomorrow, they should be taking it down and repositioning it around the back and east facing side of the house to start the work on the façade.

Thankfully through this whole process, we only had a few small things happen, but nothing too extreme. One was the snow day when the workers showed up for about 30 minutes and then left cuz there was no way they were gonna be able to work in the snow and cold, the second thing was when it was super windy one day and they didn’t get as much work done as they could have and they left early and the third thing was the rain that we had on Monday.

For Monday’s rain, Dude had to go up all by himself at 5:30am in the morning and put a giant tarp on the roof because when the workers left on Friday there was no real threat of rain so they left the water vapor barrier and wood all exposed on the east side. Dude was really worried that we might get a heavy rain after viewing the weather report late Sunday night so we set our alarm and he went up and covered everything. This was also in case the workers didn’t show up due to heavy rain. Then we could feel comfortable knowing that at least we weren’t going to have any leaks.

While he was up there it did start to sprinkle and there was a bit of wind that kicked in so he used the surrounding tuiles to hold the tarp down. Since he was by himself the whole thing took a little over an hour, but he was successful.

About 8:30am the workers showed up. Right about then it really started to rain pretty hard but they decided to keep working and they kept the tarp on in certain areas to protect the roof, too. We took off for work and had hopes that the rain wouldn’t get any worse and happily it only last for a little bit so the workers were able to continue.

On Tuesday, the main guys said they would most likely be finished that day and they were just going to finish cementing the outer edges and the flashing around the old chimneys and our new window.

I am really happy that we actually had workers show up each and every day and stay the whole day, too! They even only took a 1 hour lunch break!

I really wanted Dude to go up on the roof and take some super duper pictures of it, but he is not too keen on walking on the new tiles. I can understand that given that it cost us an arm and a leg each for the work. So I just peaked my head out of our new roof window and took a couple of shots of the east facing side.

Then Dude decided that he was willing to climb the scaffolding to take some shots of the west facing side. I was ever so happy about this cuz his photos are better than mine. They actually show how nice our tuiles look on a large scale!

Even though my roof looks great and it’s new, Dude and I won’t be totally impressed until we get another really good rain and no leaks happen. That will be the real test!

The Roof Is About Half Done

Well, today marks the halfway point of our new roof being completed (that is what we’ve been told anyway). Since the bad weather episode on Friday we’ve been quite lucky and the workers have showed up to continue the saga. We had a bit of a scare this weekend when Dude figured out that the company wasn’t going to put a vapor barrier on top of the insulation to keep it from getting wet when it rained.

Since the main roof of the house is very high and we live in an area of excessively high winds that blow 1/3 of the year, we’ve had issues when it rains and the wind is blowing at the same time. The water has a tendency to get blown underneath the tuiles and soaks the insulation and this has been the main cause of leaks onto the ceiling. When the workers began to put the insulation down, they were just going to put the beams across it and then nail/glue the tuiles onto those beams. When Dude found out he was like, “no bueno”, they have to put a vapor barrier in. So began the weekend email-fest with the supervisor of the job.

It was a bit difficult trying to get our point across to him so we threw in a few PDFs to show the “proper” way to do it. Finally after a ton of emails and a phone call, the supervisor got our point and he said he would make it so and that on Monday morning when the workers showed up the vapor barrier would be there. I had to tell him that I was sorry for being such a pest, but what else were me and Dude supposed to do?? We have to protect our interest in the house. Why the heck pay for a new roof if it isn’t going to be done right!

Since I am not privy to any of this construction stuff, it has been up to Dude to tell me how it is (since he knows all about these kinds of things) and I’m the messenger to everyone. I feel like those ladies in the olden days who were the phone operators and you’d call them to hook you up to the party you wanted to talk to. I’m the person to hook us up with what Dude says is the right thing to do. I’m not a very good messenger, but I do try and we got our vapor barrier.

Dude is still not too happy with the roof situation and would like some other things to be done for insurance against any issues in the future, but we shall see. The owner of the company keeps assuring us that for the type of roof we have, the height of it and the fact that it is constantly exposed to high winds, that it’s being done right. I guess he will find out if we give him a call one day since we have a guaranty on the roof and if anything goes wrong his workers have to come back out for free and fix the whole dang thing.

So the last two days the team has been working on tearing off and replacing the west facing part of the roof. They said they would do the west side first and then the east side so that if it were to snow or rain we would be protected. On Monday they tore off the fiberglass covering and the old beams that we had, then they put in the new insulation and the vapor barrier. Today they are putting in the wood beams across the vapor barrier.

News to us was that the fiberglass covering that was on our roof being used as the vapor barrier for the old roof was made of asbestos.  None of this was disclosed to us when we bought the house and the company who is doing the work was not prepared for that and neither were the workers. That was so not cool. Today when the owner of the company came by I asked him for documentation on all of this and I am sending it off to the notaire. This will come in handy if we need to get a lawyer involved in this situation. This is just one other thing that was not revealed to us when we bought the house. According to French law that is a big no-no and it should have been told to us. So I have to consult with someone we know to see what can be done about this.

That whole situation could have shut down our job for a bit. Luckily the company who is doing the work got a handle on it and all is good and the job continued on, but we are going to incur fee that we didn’t know about for taking it to a special hazardous materials dump.  Not really feelin’ it when I have bad surprises like that.

Today the workers should finish the west side of the roof and tomorrow they should be moving onto the east side with repeating the same thing they have been doing the last two days.

The owner told me today that the whole roof should be done by Friday. That would be awesome if it’s true and I will definitely be giving an update on that. You all know what happens with best laid plans!

Here are some photos of the roof and the work that was done over the last couple of days.

New tuiles!!!

 

I have to say that I like the color of the tiles and we will have one of the newest roofs in town!

It will be so nice when it’s done cuz with the fiberglass and tiles pulled off it’s mighty cold on the third story of our house. There’s not really anything but a small layer on the ceiling to protect us against the cold outside. In order to keep our one room that we live in a bit warmer, Dude made a paper cover/door across the access of the stairway that leads from the kitchen to the upstairs. This way we don’t get a super cold, crazy, down draft from the third story. It’s working like a charm and our kitchen is even warmer than usual.  We even get to benefit form psychedelic colors in the afternoon!

Seems like we’ve managed to keep rolling along. That’s keeping me in a good mood, which is a big plus for my family 🙂